Great Western Scoping Study Update Onsite Gold Processing
design and cost onsite gravity milling solutions for Great Western. His concepts and designs have been based on the following early stage assumptions: • Gravity recovery of ~85% • ~400,000 ton of material* • Grade ~/t** • 25 to 40 ton per hour milling capacity Gravity Recovery*** has been based on these early stage results: